Doña Ana Elementary School Roof Repairs Scope of Work
- Clean and prep repair areas.
- Applied Hydrostop base coat to area, immediately embedded with polyester fabric and followed with a second layer of base coat.
- Allowed area to dry.
- Applied hydro stop finish coat over entire area.
CLIENT:
Las Cruces Public Schools
CATEGORY:
Roof Repair
PROJECT:
Government
LOCATION:
Las Cruces, NM
INFO:
Hydrostop Roofing
LIKE:
[wp_ulike]