Kirtland AFB GranCor APOC Renovation
- Removed gravel ballast to upper roof, penthouse #1, penthouse #2 (Approx. 21,000 sq. ft.)
- Cut back base flashing and prepare for lightweight concrete.
- Poured light weight concrete over existing roofing and insulation system.
- Installed new Hydrostop fluid applied roofing system over new light weight concrete as per manufacturer’s specifications.
CLIENT:
Grancor Enterprises
CATEGORY:
APOC Roof Renovation
PROJECT:
Commercial
LOCATION:
Albuquerque, NM
INFO:
APOC Roofing
LIKE:
[wp_ulike]