Kirtland AFB GranCor APOC Renovation

  • Removed gravel ballast to upper roof, penthouse #1, penthouse #2 (Approx. 21,000 sq. ft.)
  • Cut back base flashing and prepare for lightweight concrete.
  • Poured light weight concrete over existing roofing and insulation system.
  • Installed new Hydrostop fluid applied roofing system over new light weight concrete as per manufacturer’s specifications.

CLIENT:

Grancor Enterprises

CATEGORY:

APOC Roof Renovation

PROJECT:

Commercial

LOCATION:

Albuquerque, NM

INFO:

APOC Roofing

LIKE:

[wp_ulike]