Rio Rancho Baseball Clubhouse

Rio Rancho High School – Hydro-Stop Premium Coat System

3,910 sq. ft. includes field, perimeter and base flashings.

    • Repaired BUR membrane as needed.
    • Removed existing base flashing and counter flashing.
    • Swept all debris off roof surface.
    • Power washed (twice) entire surface and base flashings @ 3000PSI removing all debris and dirt.
    • Applied foundation coat with polyester fabric embedded with addition foundation coat on top at a total rate of 25-40 sq. ft. per gal to horizontal and vertical surfaces.
    • Applied 4 coats of finish coat to entire roof system (white) at a rate of 35 sq. ft. per gal = 24.2 dry mils.
  • CLIENT:

    Rio Rancho Public Schools

  • CATEGORY:

    Roof Renovation

  • PROJECT:

    Government

  • INFO

    Hydrostop Roofing

  • LIKE:
Begin typing your search above and press return to search.