Scope-of-Work for UNM – Lomas Pedestrian Overpass

  • Installed safety barriers
  • Pressure washed the walkway
  • Installed (2) coats of Sher-Crete surfacing system at a rate of 125 to 150 ft² per gal
  • Installed (2) coats of H & C Paver Sealer at a rate of 125 to 150 ft² per gal

CLIENT:

UNM Health Science Center

CATEGORY:

Pedestrian Overpass

PROJECT:

Government

LOCATION:

Albuquerque, NM

INFO:

Walkway Renovation

LIKE:

[wp_ulike]