0%

UNM Walkway Renovation

Scope-of-Work for UNM – Lomas Pedestrian Overpass

  • Installed safety barriers
  • Pressure washed the walkway
  • Installed (2) coats of Sher-Crete surfacing system at a rate of 125 to 150 ft² per gal
  • Installed (2) coats of H & C Paver Sealer at a rate of 125 to 150 ft² per gal
  • CLIENT:

    UNM Health Science Center

  • CATEGORY:

    Pedestrian Overpass

  • PROJECT:

    Government

  • INFO

    Walkway Renovation

  • LIKE:
Begin typing your search above and press return to search.