Scope-of-Work for UNM – Lomas Pedestrian Overpass
- Installed safety barriers
- Pressure washed the walkway
- Installed (2) coats of Sher-Crete surfacing system at a rate of 125 to 150 ft² per gal
- Installed (2) coats of H & C Paver Sealer at a rate of 125 to 150 ft² per gal
CLIENT:
UNM Health Science Center
CATEGORY:
Pedestrian Overpass
PROJECT:
Government
LOCATION:
Albuquerque, NM
INFO:
Walkway Renovation
LIKE:
[wp_ulike]